Abstract

This study aims at optimizing lead time through effective management of resources in an equipment manufacturing industry to ensure timely completion of the projects. The concept of “project crashing” was implemented to identify potential activities at production line of conventional two-roller machines. The developed model is optimized using modified Genetic Algorithm (GA). The results showed that the proposed model enabled to deliver products as per schedule without increasing planned cost. Sensitivity analyses were also conducted to find out the impact of various process parameters. From analyses, it was found that the proposed model facilitate the manufacturer in delivering the products at specified time with increasing the planned cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.