Abstract

The electrical system of offshore wind farms is the key to transmit the power from wind turbines to onshore power grid. With the increase of the offshore wind farms capacity and the distance from shore, the traditional centralized offshore substations is facing the challenges of capacity and construction. To solve the above problems, we propose the lightweight substation and an improved k-medoids clustering method to find lightweight substation locations, in addition, we establish the life cycle cost model of electrical system. The example of a real offshore wind farm is taken as an optimization object. The final result shows that the lightweight substation can decrease the economic costs of the offshore wind farm electrical system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.