Abstract

ABSTRACT The article deals with the influence of the amortization period in the optimization of a distributed urban district heating and cooling trigeneration system. The model, presented in detail in [1], is based on a Mixed Integer Linear Program (MILP) and includes a set of micro-cogeneration gas turbines for producing electricity and thermal energy and a set of absorption chillers, driven by cogenerated heat, for producing cooling energy. Micro-gas turbines and absorption chillers can be used instead of purchasing electricity from the grid, producing thermal energy by boilers and cooling energy by compression chillers. Moreover, various building can be connected each other through a district heating and cooling network (DHC network). The optimization specifies the kind, the number and the location of cogeneration equipment and absorption machines, the size and the position of district heating and cooling pipelines as well as the optimal operation of each component. The objective function takes into ac...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call