Abstract

The analysis of options for arranging an adsorber composed of several sections is given. The formulas for calculating the geometric parameters of individual adsorber elements were obtained for a specified diameter of the cooling nitrogen bath. The expenditure of refrigerant and energy required to regenerate the sorbent were defined for several constructional variants. The operating costs for a single adsorber cycle were calculated. The optimum regeneration temperature was determined at which the cost of purifying the mixture is minimal.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.