Abstract

To choose an appropriate construction scheme for subway, it,s feasible to use fuzzy optimization theory and comprehensively consider the security of four construction methods as well as such factors as environmental influence, construction period, construction difficulty and construction cost, etc. to set up a mathematical model for the construction method of subway station. An analysis is made on the impact of group-effect in the excavation construction of pilot tunnel presented in PBA construction method on arch crown settlement and ground surface settlement, and a study is made on the arch crown settlement and ground surface settlement caused by the four construction methods in construction process. In addition, a contrastive analysis is made to draw a conclusion that PBA construction method is the most suitable construction method for Xinbai Square Subway Station in Shijiazhuang.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.