Abstract

An operational process at train marshaling yard is considered in this study. The inbound trains are decoupled and disassembled into individual railcars, which are then moved to a series of classification tracks, forming outbound trains after being assembled and coupled. We focus on the allocation plan of the classification tracks. Given are the disassembling and assembling sequence, the railcars connection plan, and a number of classification tracks. Output is the assignment of the railcars to the classification tracks. An integer programming model is proposed, aimed at reducing the number of coupling operations, as well as the number of dirty tracks which is related to the rehumping operation, and the order of the railcars on the outbound train must satisfy the block sequence. Tabu algorithm is designed to solve the problem, and the model is also tested by CPLEX in comparison. A numerical experiment based on a real-world case is analyzed, and the result can be reached within a reasonable amount of time. We also discussed a number of factors that may affect the track assignment and gave suggestions for the real-world case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.