Abstract

An analytical model is presented for determining the economic production quantity (EPQ) at each facility in a multi-stage, multi-facility and multi-product production-inventory system. The special feature of this model is that the time required for set-up operations (loading and unloading of items) and the corresponding process inventory build-up is considered. The production system considered for modelling has multiple spindle and batch blocking facilities to reduce the processing time per unit of product. The main objective of the model is to find EPQs by minimizing the total system cost. A search method has been used to optimize the batch size. A numerical example is presented to illustrate the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.