Abstract
A problem of a line-cutting procedure is discussed for ship hull construction. This procedure includes five steps: stock arrangement, piece arrangement, marking, cutting and special processes, and delivering the work. The line-cutting procedure will be optimized when two objectives are considered: minimizing the total trim loss and keeping the working efficiency of the cutting procedure. The developed way for the discussed problem is to optimize the stock arrangement associated with a proposed rule-based piece arrangement where the former is optimized for minimizing the total trim loss and the latter for keeping the working efficiency. A tabu search is chosen for the optimization of stock arrangement. In addition, two proposed replacement moves, the aggregative and the breaking, are adopted to improve the effectiveness of the tabu search. Two real cases and some random instances are used for test and comparison. The results show that the stock arrangement was optimized satisfyingly by the tabu search and the rule-based piece arrangement is capable of keeping the working efficiency as usual. In addition, the effectiveness of the tabu search was apparently improved by two proposed replacement moves.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.