Abstract

In this paper HEC-ResSim is applied for a complex hydropower development formed by five reservoirs and related hydropower plants. There were considered characteristics of five existing hydropower developments in Romania, for which three reservoirs are with annual regulation and two with daily regulation. The objective function was the realization of a planned energy generation for one year (the mean hydrological year). Obtained results are very close to those obtained applying linear programming, a revised simplex algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.