Abstract
In the construction industry, determining project schedules has become one of the most critical subjects among project managers. These schedules oftentimes result in significant resource fluctuations that are costly and impractical for the construction company. Thus, construction managers are required to adjust the resource profile through a resource leveling process. In this paper, a novel optimization model is presented for resource leveling, called the “modified symbiotic organisms search” (MSOS). MSOS is developed based on the standard symbiotic organisms search, but with an improvement in the parasitism phase to better tackle complex optimization problems. A case study is employed to investigate the performance of the proposed optimization model in coping with the resource leveling problem. The experimental results show that the proposed model can find a better quality solution in comparison with existing optimization models.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.