Abstract

There are numerous processes used to implement quality, such as TQM, 6 Sigma, and Lean. For these quality processes to remain effective, a continuous improvement model is required and implemented from time to time. Some of these models include Define, Measure, Analyse, Improve and Control (DMAIC); Plan, Do, Check, and Act (PDCA); Identify, Measure, Problem Analysis, Remedy, Operationalize, Validate, and Evaluate (IMPROVE); and Theory of Constraint (TOC). Furthermore, continuous improvement tools need to remain effective through the use of optimization techniques to produce the best possible outcomes. This article discusses some of the current utilization of these tools and proposes different optimizing techniques and variations to make robust quality implementation tools.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.