Abstract

The Management tool AWP which optimize the project performance through application of structured planning process. This is expected to create a sample for the construction and execution that reduce the risk and deliver predictable results. By using case study methodology problems which influence the improper coordination between project team and construction people were found out and rework can be prevented through more proactive relative position between engineering and construction planning. These techniques can only been found in optimal global solution and research focus on planner decision making, there on site progress and cost management in projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.