Abstract
In order to improve the utilization rate of industrial waste heat and improve the fine design level of waste heat power station, this paper constructs the mathematical model of waste heat boiler and steam turbine, and puts forward the optimization design method of thermal system of waste heat power generation project. By using typical cases, it is proved that there is the optimal design pressure of HRSG, which makes the power generation of the system maximum, and provides a method to improve the power generation of HRSG.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.