Abstract
When traffic demands are different in successive time periods, the signal settings that are optimal for each individual period are only local solutions to the problem. These settings may be readjusted and the changes between them shifted in time so that the overall performance for those periods taken together is improved. A sequential optimisation technique has been developed to minimise the total junction delay over the successive periods taken together by searching for the optimal signal timings and the time-shifts subject to certain queue length considerations, and each traffic stream in the junction can be undersaturated or oversaturated during a time period. Some example calculations are given and the results show that such a technique can provide modest improvements in the junction control performance and give less delay than the existing methods that optimise only for individual periods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.