Abstract

Time, cost and quality are major concerns in construction project management. To achieve a balance between time-cost and time-quality, a trade-off problem among time-cost-quality (TCQ) is proposed for optimisation by the application of a genetic algorithm (GA). A GA attempts to minimise a fitness function that describes the objective to be achieved. The fitness function is specifically designed according to the nature and characteristics of the construction project. By inputting the project parameters, the fitness function should be able to provide a balance between the time, cost and quality of the project. This study applied a GA to strategically search for the best project parameters for an offshore wind farm project to achieve a more accurate prediction for construction time, cost and quality of the project in the pre-construction stage. A series of practical mathematical models are developed through a review of previous studies based on specific merits, and a real offshore wind farm project is studied to identify and verify the applicability and viability of the mathematical models. After the process of optimisation, the results show that the output data is very close to the actual case in terms of construction time, cost and quality.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.