Abstract
Oil produced at Vietsovpetro’s fields has high paraffin and asphaltene content and high pour point temperature; meanwhile the low temperature at the well head causes paraffin and asphaltene deposition to form in the collection and transportation system, causing hazards and risks during the pipeline operation. The paper analyses the factors affecting the efficiency of the pigging operation to clean the oil transportation pipelines from the CTC1 platform (Ca Tam field) to the RP-2 platform (Rong field), Cuu Long basin, solutions and how to operate the pipeline system in order to improve the efficiency of the pipeline cleaning process by pigging.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have