Abstract

Owners and operators of electricity networks are reviewing policies and procedures to ensure the optimum level of maintenance is carried out on network plant. EA Technology has worked closely with a number of UK RECs to assist with the introduction of maintenance regimes which are based on establishing the condition (and future performance) of assets using carefully designed programmes of sampling and inspection. These programmes are resulting in very significant cost savings while maintaining or improving the level of reliability and safety. This paper describes the application of a maintenance optimisation scheme related to 11 kV oil filled switchgear within UK electricity companies. It is believed the approach described can not only be applied more widely to 11 kV oil filled switchgear but many of the generic features are applicable, with the potential for very significant savings, to other assets on electricity networks and beyond.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.