Abstract

Although the performance of the CUSUM chart in detecting small process shift is better than Shewhart chart, there exists cases in reality that require very quick response of detecting small process shift. This paper studies the influential factors that affect the CUSUM control chart design and its in-control and out-of-control average run length (ARL) values. The controllable factors studied are the slack value k; the decision interval h; and the Headstart or Fast Initial Response. These factors are varied at different values for the process expected shift (in standard deviation units) δ. Following this, a non-linear regression model is deduced to compute the ARL of the control chart at any combination of process and control chart variables. Optimisation model is utilised to achieve a specific value for the ARL through fixing the controllable factors. A computer program coded in Matlab workspace (Matlab and Statistics Toolbox Release, 2015) is used for the computation of the ARLs values.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.