Abstract

Climate change mitigation has been a global effort and energy generation is one of the primary sources of GHG emissions. There is a need to transition from fossil-based energy to renewable-based energy. One of the platforms to nourish the work is Eco-Industrial Park (EIP) which it promotes resource efficiency, industrial symbiosis, and circular economy practice. There is a need to explore an optimal configuration of multiple renewable energy (RE) systems in a centralised EIP facility that generates electricity for internal consumption and exports the excess energy to the grid. This model developed a mixed-integer non-linear programming (MINLP) model that considers RE from biogas, biomass, micro-hydro, and solar sources for a centralised water hub. The energy generated is primarily used for the main processes involved in the facility as the excess energy will be supplied to the grid. A case study and two scenarios were assessed, and the results offered simultaneous technical, economic, and environmental benefits, which are in the forms of multiple RE generations, additional yearly profit, and GHG emission avoidance from fossil source. This will further strengthen the envisioned role of EIP as it is also capable of supporting the United Nations Sustainable Development Goal (UNSDG) and RE100 agenda.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.