Abstract
In this paper, we present a real life assembly line balancing problem for a motorcycle manufacturing company. Results from the initial situation in the company are compared to those provided by a heuristic method and by a novel neighbourhood search method. An ARENA simulation model is developed to test the different proposals. The model was validated by comparing the simulation results from the initial company scenario with the real operation results. Consequently, the extension to the developed proposals allows us to select an adequate assembly line for the company, resulting in a greater productivity level and a more balanced line with respect to the operation times in the stations and the activity of the workers. The company has subsequently implemented our proposed schedule, obtaining remarkable improvements in its productivity.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.