Abstract

The measurement and improvement of track quality are key issues in determining the time at which railway maintenance must be performed and its cost. Efficient track maintenance ensures optimum allocation of limited maintenance resources which has an enormous effect on maintenance efficiency. Applying an appropriate tamping strategy helps reduce maintenance costs, making operations more cost-effective and leading to increased safety and passenger comfort levels. This paper discusses optimisation of the track geometry inspection interval with a view to minimising the total ballast maintenance costs per unit traffic load. The proposed model considers inspection time, the maintenance-planning horizon time after inspection and takes into account the costs associated with inspection, tamping and risk of accidents due to poor track quality. It draws on track geometry data from the iron ore line (Malmbanan) in northern Sweden, used by both passenger and freight trains, to find the probability distribution of geometry faults.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call