Abstract

Abstract The optimisation of pile groups is studied using an optimisation technique in conjunction with a discrete element method for pile group settlement analysis. It is demonstrated that it is possible to optimise the performance of pile groups by minimising the load differentials between piles and/or differential settlements. This could be achieved by apportioning the lengths of the group piles to meet the requirement of their positions in the group. Numerical examples are presented to illustrate this principle.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.