Abstract

When designing the strip mining methods at the deep open pits at the stage of preliminary studies, it is necessary to determine the optimum number and succession of relocation of crushing and transfer stations while developing the open pit. This cuts the transport costs and reduces the number of dump trucks required. An analytical dependence has been established to determine the optimum number of transfer points with their uniform location along the length and height of the open pit working area. The features of changes in the basic technological parameters of truck operation, depending on the number of crushing and transfer stations, the open pit size and output are studied. The conditions for simultaneous use of several crushing and transfer stations, their optimum number and performance have been determined; the economic benefits of using the flowcharts with multiple transfer points have been estimated. Optimisation of the number of transfer points reduces the required capacity of each crushing and transfer plant of up to 10-20 million tons/year. Reducing the required capacity of transfer points makes it possible to equip them with primary jaw crushers.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.