Abstract
The general Facility Layout Problem deals with the arrangement of machines within the facility based on the constraints such as material flow distance, volume of flow of products, material handling cost and operation sequence of product. The facility layout problem is directly linked with the efficiency of the facility or the manufacturing line. The objective of this project is to design a simulation based methodology experiment on designing an optimized facility layout and evaluating the proposed alternative layouts using ARENA simulation. This project is conducted at Benteng Motor Sdn. Bhd. in Kota Kinabalu, Sabah. Currently, the company is planning to expand their manufacturing plant and hence the company needs an optimized facility layout to maximize the product capacity and manufacturing throughput time on a minimum utilization of resources environment. An eight steps simulation methodology is being proposed to design an optimized facility layout. A manufacturing re-engineering scenario has been developed to improve the existing system. The proposed scenario was evaluated using Arena simulation student package. The scenario has significantly increases the production capacity up to 225%, decrease the manufacturing throughput time by 19% as well as increase the utilization of majority of the manufacturing resources more than 200%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.