Abstract

The layout of temporary facilities for a construction project greatly impacts project performance as demonstrated in many prior studies. This paper demonstrates how the site layout process can be automated for specific types of construction. Utility tunnel construction was selected as the specialty area, for which a partially automated site layout application was built. This approach integrates general purpose simulation for modelling space, logistics and resource dynamics with genetic algorithms for optimizing the layout based on various constraints and rules. We achieve this by implementing a site layout optimisation system within a simulation environment which already models tunnel construction processes. The new modelling strategy provides a medium for seamless integration between the resulting site layout and the discrete event production simulation models. The paper describes the approach taken and the system developed, presenting a practical case study from a tunnelling project in Edmonton, Canada to illustrate the system’s performance and its validation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.