Abstract

This paper addresses the quay crane scheduling problem (QCSP) under uncertain conditions at container terminals. Variations in container volume, arrival time, equipment functionality and weather conditions create significant uncertainties when scheduling loading and unloading tasks. In order to maintain the service level of the port under various conditions, port operator urgently need to execute a robust schedule. In this paper, a stochastic programming model is formulated to minimise the makespan of quay crane service, using a particle swarm optimisation (PSO) algorithm integrated with optimal computing budget allocation (OCBA) to improve computational efficiency. Numerical experiments show that the applied algorithm performs well under uncertainty.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.