Abstract
In this research, several approaches for the optimisation of batch processes are investigated and compared. The motivation for this is the analysis of an oven work centre in a semiconductor wafer fab. Different objectives like keeping operational due dates as well as the minimisation of lot completion time will be optimised with regard to existing process constraints. First, the problem is modelled from two different viewpoints: as scheduling problem and with the help of a simulation system. For this, it used mixed integer programming (MIP) and a discrete event simulation system respectively. As a next step, a MIP time window decomposition approach combining simulation and mathematical programming is discussed. This reduces the complexity of the given problem by solving local sub-problems. Experiments on real manufacturing data determine the optimisation potential for the work centre using the different approaches. This allows, among others, a comparison to dispatching strategies as they are used in the manufacturing line.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.