Abstract

The compliance of clean water supply in Rokan Hulu Regency especially in Pasir Pengaraian City is still very limited. Based on the results of the field survey, it is known that clean water service for Pasir Pengaraian city is only 21.89%, which means that the existing clean water service is still far below the government's target of clean water service, which is 68% for urban areas. This research describes the effort to compliance the clean water in Kota Pasir Pengaraian by optimizing the service and development of water supply Pasir Pengaraian city. The way it is done is the development of clean water infrastructure with a gradual system that is short-term, middle-term and long term. The development undertaken is the Development of Piped In Water Installation Installation (IPA); Development of Batang Lubuh River Intake Locations; Development On TVRI Reservoir; Development At Pawan IPA location; Development of Langgopan Reservoir Location; Distribution With computer System Pattern

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call