Abstract

PT Adi Satria Abadi (ASA) is a company engaged in the processing of leather, especially sheep skin and goat skin, which is used for the manufacture of golf gloves. The problem faced by the company is the production process that exceeds the due date to other customers who order products at PT ASA. From the research, it is known that the cause is a company scheduling method that has not been organized so that the production sequence is concurrent. Selection of methods Harmony Search algorithms in scheduling are caused by delays. The Harmony Search algorithm can provide a better makespan value than the company method. The results of the company method obtain 0.9 months makespan average, the Harmony Search Algorithm method produces an average 0.8 months makespan. In addition, the use of the Harmony Search Algorithm method can reduce the average value of 0.1 months makespan. The results of the study in three months experienced time savings of 0.6 months, 0.6 months and 0.1 months respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.