Abstract
The grade or slope of the road in a mining activity is certainly unavoidable. In addition to naturally following topographical contours, the shape of the mining pit is carried out from a high elevation leading to the lowest elevation following the slope level and the continuity of the excavation material makes the road should be made sloping. The high or low value of the road grade in addition to affecting the speed and travel time required by the unit, of course, also affects the level of fuel consumption. PT. Pamapersada Nusantara uses a conveyance unit with the HD Komatsu 785-7 type to move overburden material. Based on the results of the analysis, in the loaded condition, grade 2% uses 0.45 liters of fuel, 5% grades 0.77 liters, 6% grades 0.89 liters, 8% grades 1.09 liters and grades . While in the unloaded condition, grade 2% uses 0.19 liters of fuel, 5% grades 0.35 liters, 6% grades 0.4 liters, 8% grades 0.47 liters and 9% grades 0. 52 liters.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.