Abstract

The medium voltage network of bacan feeders was an air line power network and had a very high potential to experience disruptions impacted on customer outages. The bacan feeder network was divided into sections uisng breaker equipment (Recloser/LSBM) in order to narrow down the area of blackout when a disturbance occurs. The work function of the breaker equipment was not yet optimal, so it can have an impact on the length of time the customer goes out when there was a network disturbance. From the simulation of the existing feeder conditions, the ENS (Energy Not Supplied) results were really high and the duration of the shutdown was every long so we optimize the breaker equipment (LBSM) by resetting the sectionalizer and telesignaling SCADA (Supervisory Control And Data Acquisition) and RTU (Remote Terminal Unit) on LBSM that has not been intergrated with SCADA. Based on the results of the analysis, evaluation and simulation, after the optimization of the SCADA-based sectionalizer function had been applied to the LBSM equipment, the ENS value and the feeder shutdown duration function due to the disturbance of the bacan feeder network could be significantly reduced

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.