Abstract

This study aimed to optimize the cost and time of implementation of development projects in residential homes Citraland located in the town of Palu subdistrict villages Mantikulore Tondo. Completion of construction of residential houses has been delayed time of completion of the construction. This leads to greater costs incurred in development projects. Therefore, to solve these problems is necessary to analyze the optimization of project time to determine how long a project is completed. Optimization of costs and project execution time is calculated using the Critical Path Method (CPM). The method is based on the results obtained, namely the normal completion time of the project for 69 weeks with a total cost of Rp. 297,887,212.00. Aftertime optimization through crashing eachthe implementation of the activities of the development to 48 weeks with a total cost of Rp. 350,261,175.00. The probability of completion of project design development using methods Program Evolution and Review Technique (PERT) is great opportunity to complete the project work for 48 weeks amounted to 93.19%

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.