Abstract

The purpose of the article is to specify and supplement the methodology of engineering calculation of rain runoff control at the treatment plant, given the current regulatory and methodological framework. Two flow management schemes, including an intermediate tank, a pumping station, and a separation chamber, have been analyzed by mathematical modeling. Changes in the calculation formula for determining the required volume for the tank connection scheme when emptying the tank by gravity are proposed. There is a significant difference in the calculation results according to the proposed and current regulatory methodologies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.