Abstract

The cutting processes of rebar stock in housing project cause a large amount of waste because of high variety between required rebar lengths and standard rebar lengths, this problem is called one dimensional cutting stock problem. This research aims to utilize the rebar stock and minimize the losses using integer linear programming approach- aided by Advanced Interactive Mathematical Modeling System (AIMMS) software for solving the problems. These one- dimensional cutting rebar stock problems are divided into 19- problem according to the variety in the rebar diameter (25 mm, 16 mm, 12 mm, and 10 mm), and the variety in the design of activities in that housing project. The losses that are produced for each activity are utilized in the next activity when the length of item losses is larger than the required small item lengths in next activity for the same rebar diameters. That makes the utilization is to be maximized, where the Utilization Stock Ratio is reached to (98.53%).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.