Abstract

The selection of liquefaction process is of great significance for distributed-scale LNG (liquefied natural gas) plant. This paper proposes four configuration strategies of expansion liquefaction cycle for distributed-scale LNG plant, namely multistage expanders, single precooling cycle, regeneration and mixture working fluid. FOM (figure of merit) is applied to evaluate the liquefaction cycles for distributed-scale LNG plant. Sixteen feasible liquefaction cycles are configured based on the configuration strategies and then optimized by genetic algorithm to maximum FOM for optimal synthesis. The cost analysis and exergy analysis of system are investigated. The optimized liquefaction process (Case 8) has two cycles, namely R410A precooling cycle and parallel nitrogen expansion cycle. The results show that the FOM of the optimized liquefaction cycle is 0.566 for distributed-scale LNG plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.