Abstract

The focus of this paper is on the hot rolling stage of a steel producing company. We analyze the synchronization problem of non-identical reheat furnaces and the hot rolling mill. The task is to set the feed-in and drop-out times of slabs to different types of reheat furnaces to reduce the dispensable energy consumption and increase the production rate of the whole process. The problem is formulated as a LP and is applied to generate schedules for a steel production company in Austria. The results show that our proposed model outperforms the industry benchmark by reducing the reheating time within the furnaces and the waiting time of the hot rolling mill.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.