Abstract
This article presents the optimization of the substation location of a wind farm using metaheuristic algorithms. This method can reduce the total length of cable which has a direct impact on the electrical power losses. The cost of the electrical system is estimated between 15-30% of the total investment costs. By optimizing the substation location, these high costs can be avoided even in the design phase of the wind farm. The optimization methods are tested on a regular as well as an irregular wind farm. In order to check the reliability of the optimization methods, two real existing onshore and offshore wind farms are used. The results of the proposed optimization show that the optimization of the substation location is an effective way to design the wind farm layout with low cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.