Abstract

New telecommunication towers are installed in remote/rural areas to facilitate the increasing connectivity worldwide. With concerns over environmental issues, such towers are to be environmentally friendly. Conventionally, diesel generator supply power to towers in remote/rural areas, which leads to carbon emission. Also, the operation of diesel generator entails considerable operating cost (fuel and maintenance costs). Thus, a wind-photovoltaic (PV) based DC microgrid is proposed for supplying power to telecommunication towers in remote/rural areas ensuring reliable, economical, and green power supply. Therefore, techno-economic analysis is carried out here to determine the feasibility and cost of electricity (COE) per unit of the proposed DC microgrid. A non-dominated sorting genetic algorithm II is implemented to solve the multi-objective optimal sizing problem to achieve a trade-off between the cost and the reliability. Hourly solar irradiation and wind speed data is used for long-term analysis equivalent to the lifespan of the battery. Further, de-rating factor and maximum power point tracking factor are considered while modelling the renewable resources. The loss of power supply probability, excess energy, and COE are calculated and different scenarios are studied to examine the techno-economic feasibility of the proposed DC microgrid.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.