Abstract

AbstractIn this literature, the simultaneous placement of both the Renewable Distribution Generation (DG) and Distribution STATCOM (DSTATCOM) in the Radial Distribution System (RDS) for Power Loss Minimization (PLM) is discussed. Loss Sensitivity Factor (LSF) is initially applied to discover the candidate location of DG and DSTATCOM in RDS. The effective Hybrid Lightning Search Algorithm‐Simplex Method (LSA‐SM) is used to compute the optimal sizing of DG and D‐STATCOM. The performance of the proposed method is tested separately on both IEEE33 and IEEE69 RDS test systems. The improvement in system Voltage Profile and operational stability before and after the allocation of DG and DSTATCOM is discussed. The improved system Voltage Stability Index values for different cases are plotted. The performance of the proposed method is compared with similar existing methods.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.