Abstract
Both the lack of the downward regulation capacity and the transmission capacity limit have led to considerable wind power curtailments in China. The battery energy storage system (BESS) provides a new solution to reduce the wind power curtailments due to its relatively high energy density and flexible installed location. In this paper, a new bi-level programming model is proposed to optimize the size and location of BESS for reducing the wind curtailments. The revenues of BESS, when it is located either at the wind farm or the load center, are considered comprehensively. Moreover, a numerical optimization algorithm is developed to solve the proposed model. Simulation results demonstrate the validity of the proposed model and developed algorithm. They also reveal that the BESS located at the load center offers more net profit compared to the one located at the wind farm. Subsequently, sensitivity analysis is performed to assess the effect of key parameters on the optimal values of BESS.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.