Abstract

This paper proposes a Bi-Level optimization to determine the optimal size and location of wind turbine (WT) and photovoltaic (PV) generator in distribution network. At first level of optimization the optimal capacity in each bus is determined without consideration of kind of technology by maximizing the profit. At second level of optimization the number of WT and PV in each bus is determined by minimizing the cost. The minimum cost is used at first level of optimization to calculate the profit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.