Abstract

<p>An optimal short-term hydro-thermal scheduling (ST-HTS) problem is solved in this paper using the multi-function global particle swarm optimization (MF-GPSO). A multi-reservoir cascaded hydro-electric system with a non-linear relationship between water discharge rate, power generation and net head is considered in this paper. The ST-HTS problem determines the optimal power generation of hydro and thermal generators which is aimed to minimize total fuel cost of thermal power plants during a determined time period. Effects of valve point loading and prohibited operating zones in the fuel cost function of the thermal power plants is examined. Power balance, reservoir volume, water balance and operation constraints of hydro and thermal plants are considered. The effectiveness and feasibility of MF-GPSO algorithm is examined on a standard test system, and the simulation results are compared with other algorithms presented in the literature. The results show that the MF-GPSO algorithm appears to be the best in terms of convergence speed and optimal cost compared with other techniques reported in the literature.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.