Abstract
The questions of the rational/optimal service term of the warehouse bridge cranes on the exploitation and projection stages are observed. The method of the residual crane resource’s definition by the criterion of the specific reduced responses is suggested. On the stage of the crane projection, the forecasting of the warehouse cranes’ resource in coordination with their constructive parameters is expedient. The existing task has main aspects: recognition of the residual crane resource and definition of the project crane resource. In course of time in the massive of the sample from the low carbon steel occur changes: grows firmness, equalize the internal tensions, little internal cracks “overgrow”, sometimes the groups of little cracks create macrocracks. This are a diffusion action. The definition of the rational constructive parameters is being carried out on the base of the work processes’ mathematical modelling. On the base of modelling is defined the size of the residual deflection of the main beam that is formed during one work crane cycle considering the action of the main beams’ free vibrations in the processes of start and braking considering the factor of the attenuation of those vibrations. In result of the modelling, we receive the microscopic size of the residual deflection, formed during one work cycle. On the base of the multisession modelling is noticed that the crane resource can be prolonged on 20-50%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.