Abstract

Cluster tools have been extensively used for many semiconductor manufacturing processes such as lithograph, etching, deposition, and testing. Most previous studies on cluster tool scheduling have focused on steady cycles in which cluster tools repeat identical work cycles. However, the proportion of noncyclic transient operation cycles such as start-up cycles and close-down cycles becomes larger as the lot size tends to be smaller. We examine optimal transient scheduling for a single-armed cluster tool, in which there are parallel chambers and a process chamber is a bottleneck, while minimizing the makespan of a lot. To do this, we first identify fundamental properties of noncyclic transient cycles in a tool by analyzing resource workloads. We then propose a simple robot task sequence, a generalized backward sequence, which performs backward operations incrementally for start-up cycles and decrementally for close-down cycles. We also develop workload-based conditions for which the generalized backward sequence has the minimum makespan for single-armed cluster tools with parallel chambers. Finally, we develop a linear programming model to find the minimum makespan of the generalized backward sequence for the cases in which the conditions are not met and show its effectiveness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.