Abstract

The semi-conductor integrated circuit electronic devices process has many re-circulation production paths through the stages of product manufacturing. These kinds of processes can be defined as the multi-purpose batch process with re-circulation products if they produce more than two products. In this paper, we have developed the completion time algorithms for a single line multi-purpose batch process including re-circulation products with consideration of the non-zero set-up times and transfer times. We also developed the optimization method, genetic algorithm, for optimal scheduling of a multi-purpose batch process including re-circulation products. Several randomly generated examples were tested using the proposed algorithm, and the Gantt chart results are presented. We used Genetic Algorithm for solving the scheduling problems, and optimal solutions are also presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.