Abstract

Optimal scheduling of maintenance and improvement on the water main system is a substantial problem since it can greatly reduces the potential threat of failure and the expenses. The Markov decision process (MDP) based methodology to find the optimal schedule which minimizes the cost is proposed. Since it needs the information about the current state of pipe, cost, and deterioration model, the definition and the usage of auxiliary information are also presented. The objective function and detailed algorithm of dynamic programming (DP) are modified due to the difficulty of implementing the conventional DP approaches. The result is compared to two simple policies via Monte Carlo simulation. Validity of the solution and improvement in computational time are proved. Proposed decision framework provides an easy way to obtain the comprehensive and local-specialized policy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.