Abstract
In this paper, a novel model of electric-hydrogen integrated charging station (ICS) is proposed, which is composed of battery swapping station (BSS) and hydrogen station (HS). The BSS model, which mainly includes user adaptive response model, battery allocation and scheduling strategy, is established to realize the reasonable management and allocation of batteries. The HS model mainly includes hydrogen production module, hydrogen storage module, hydrogen charging module, fuel cell module and hydrogen scheduling strategy to optimize scheduling from hydrogen production to use. In addition, the BSS can provide energy for HS, and both BSS and HS can feed back the stored energy to the power system during peak load, which is beneficial to the stable operation of the power system. Simulation shows the rationality and correctness of the proposed optimization model. The proposed model and optimization strategy can improve the flexibility and economy of ICS, and help the power system to cut peak and fill valley.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.