Abstract

This paper is aiming at solving a joint optimization of transmit powers (TPs) and transmit time (TT) allocation problem. The joint optimization problem needs to consider nonideal power amplifiers (PAs) efficiency, non-negligible circuit powers (CPs) consumption and direct links (DLs) in relaying transmission (RT) simultaneously. Firstly, transmission models, spectral-efficiency (SE) analysis, and total energy consumption (TEC) models with the existence of DLs in RT are given. Secondly, minimizing TEC analysis with joint optimization of TPs and TT under non-negligible CPs consumption and nonideal PAs efficiency is given. In addition, the gradient-descent algorithm which is used to solve the joint optimization problem is given. Furthermore, optimal relay position (ORP) problems are analyzed. Simulations are presented to validate the theoretical analysis. Results reveal that the relay technique and DLs in RT can improve the system's SE and energy-efficiency (EE).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.