Abstract
Classification yards represent network nodes in the single-wagonload transport system. The processes are complex due to a high number of involved resources and restrictive dependencies. Decisions on job sequencing and resource allocation have a major impact on outbound delays and thus on the quality of service in the network. Due to permanent updates of arrival times and resource availabilities, a constant revision of decisions is necessary. In many cases, considering multiple qualifications of the personnel is crucial for efficient operations. This paper presents an approach for the rescheduling of processes and the assignment of resources in classification yards, which allows to determine best working schedules based on current data such that the cumulative outbound delay of all trains is minimized. Therefore, the paper presents a mixed integer program that includes all essential components (tracks, locomotives and personnel with individual skill patterns). For the real-time capable solution of the optimization problem, four different heuristic approaches based on priority rules are presented. The performance of these approaches is evaluated by a gap analysis with respect to the solutions found by CPLEX. For this purpose, real example data of an operation day of a large classification yard in Germany are used.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Rail Transport Planning & Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.