Abstract
ABSTRACT This study aims to optimize Yeywa Hydropower Reservoir (YHR) operation using the multi-step-ahead time-varying hedging (TVH) rule under climate change (CC) and land-use change (LUC) to improve summer power generation. The performance of three multi-objective algorithms – the Multi-objective Salp Swarm Algorithm (MOSSA), the Multi-objective Antlion Optimizer (MOALO) and the Non-dominated Sorting Whale Optimization Algorithm (NSOWA) – are compared. MOSSA provides the best solutions with a higher mean hypervolume in a shorter computation time, and it is utilized to optimize the TVH rules for four periods: monthly (TVH-1), quarterly (TVH-3), half-yearly (TVH-6) and yearly (TVH-12). The six-month-ahead TVH-6 rule and the five-month-ahead TVH-6 rule generate the highest summer power for the historical period (2011–2020) and the future period (2020–2059), respectively. The future decadal power generation is expected to be higher than the historical power generation. The future TVH-6 rule is more reliable and it has lower water deficits than the historical YHR operation rule.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.